Concrete: This is the foundational layer, usually the existing floor or substrate on which the entire structure will be built. It provides stability and support for the layers above.
Interface Agent: The interface agent is applied onto the concrete to improve the bond between the concrete and subsequent layers. It ensures proper adhesion and helps prevent issues such as delamination.
Sub Base Layer: This layer serves as a transition between the concrete and the terrazzo system. It may consist of materials like a leveling compound or a specific underlayment that provides additional stability and helps achieve the desired height or surface profile.
Cement Mortar: The cement mortar layer is applied over the sub base. This layer might act as a bedding material that helps in setting the HPI STONE and provides a level surface for the final layer.
Surface Layer – HPI STONE: This is the topmost visible layer, made up of HPI STONE material. This layer is carefully laid, compacted, and then ground and polished to achieve the desired appearance.
Mixing: mixing the inorganic terrazzo special glue evenly
Roll coating: apply to the back of HPI stone with a roller or brush
Air Dry: leave to dry for 4-12 hours. Use after the surface is dry
The base must be firm, and keep clean, with no dirt, and no material to affect the adhesion exists.
Single component binder:
Please mix 20KG powder and 5KG water, pour into a clean empty barrel, and stir until no particles can be.
Two-component binder:
Please mix the emulsion and powder according to the predetermined proportion, pour into the clean empty barrel, stir until there are no particles, and let stand for 5-10 minutes.
1. Apply a layer of adhesive to the base surface with a toothed spatula
2. Use a toothed spatula to scrape a layer of adhesive evenly on the back of the pretreated sheet.
Note: do not oversize the base surface area, avoid adhesive surface peeling after bonding, which affects the adhesion.
1. Put the coated and scraped HPI stone on the bonding layer, fully knead, press, and level.
2. Tap the surface with a rubber hammer for better contact with the binder and adjust the gap within 15 minutes.
Note: No washing or rain shall be allowed within 24 hours after application
1. The width of the gap between the HPI stones is 1-1.5 mm, and the gap is cleaned with 1-1.5 mm separator and sponge in time
2. Longitudinal and transverse every 8-10 meters to set up 10 mm of structural expansion joints, leaving the seam depth to the base.
1. Early stage: soft carpet and plasterboard combination
2. Mid-late: the main flow of people using fireproofing board to replace gypsum board for protection
Note: At least 3 days after application.
SGS CERTIFICATE NO. GZIN2107040358CM
CERTIFICATE NO.
GDTS22CGP020000015
Add: 2206 Huiteng Metropolis, #321 Jiahe Rd,
Xiamen Fujian China
Tel: +86-592-5200826丨Fax: +86-592-5200816
E-mail: victor@seikou-group.cn 丨 amy@seikou-group.cn